top of page
OK trial.jpg

Value-added Services

Candidate Selection

Select proper candidates for refrac or conformance operation based on production history, wellbore configuration, available well intervention options, etc.

Onsite Service

NewWell Tech engineers provide onsite service and give instruction of how to apply for the technologies and pump the chemicals.

Solution Design

Treatment design based on wellbore conditions, such as treatment volume, and fluid placement method.

Post Job Analysis

Analyze treatment curves, and conduct production analysis/evaluations. Efficiently Optimize Solution for Field-wide Application. Summarize the experiences from a single well and develop a field-wide solution.

New Fluid Development

Engineer and adjust the recipes of our crosslinked fluid systems based on differential pressure rating, bottomhole static temperature, and pumping time.

bottom of page